[Australian data centre tracker]

Data centres in Western Australia

As at 23 November 2026, we track 7 active data centre projects in Western Australia, and 5 of them have a lodged planning application.

Western Australia data centre projects

Data centre projects in Western Australia, as at 23 November 2026
ProjectDeveloper or applicantLocal government areaStatusStated capacityPlanning application lodgedVerificationSource
CDC Hazelmere data centre, 178 and 196 Bushmead Road (City of Swan DA-386/2026)CDC Data CentresSwanUnder assessmentNot statedYesVerified (official source)City of Swan, Swan Engage: DA-386/2026 Proposed Data Centre
CDC Maddington CampusCDC Data CentresGosnellsUnder construction150 MW (IT capacity)NoVerified (official source)CDC Data Centres website
Data Centre and Ancillary Office, 92 Windsor Road, Wangara (City of Wanneroo DA2022/157)Not statedWannerooUnder assessment (2022; determination not found)Not statedYesVerified (official source)City of Wanneroo consultation page DA2022/157 (Wayback Machine copy, 7 May 2025)
Data Centre at 37 Abernethy Road, Belmont (DAP/22/02272)Not stated in sourceBelmontApproved (press; official minutes archived)Not statedYesVerified (official source)Belmont DAP Part B, 28 Mar 2024
Meridien - Renewable Energy Hub and Data CentreNot stated in EPBC layerNot statedProposed (in planning)Not statedNoVerified (official source)EPBC referral 2026/10654
NEXTDC P1 Stage Two data centre, Malaga (DAP/24/02641)NEXTDC (presented to the DAP; planning consultant Urbis)SwanApprovedNot statedYesVerified (official source)MODAP/11 minutes, 8 May 2024 (City of Cockburn copy)
NEXTDC P2 Perth, 11 Newcastle Street: amendment to data centre approval (City of Perth DA-2024/5403)Not stated in council list; NEXTDC operates P2 at this addressPerthApproved (amendment)Not statedYesVerified (official source)City of Perth planning approvals issued 14/05/2025–20/05/2025
GreenSquareDC WAi1 Hazelmere, Stirling Crescent (City of Swan DA-6/2026)GreenSquareDCSwanWithdrawnNot statedYesLead only (unverified)WAtoday, 14 May 2026

Status key: Planned · Under construction · Withdrawn, refused or expired. Planned = proposed or approved, not yet under construction.

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

Methodology, sources and licences