- GreenSquareDC WAi1 Hazelmere, Stirling Crescent (City of Swan DA-6/2026)
Project details
| State | WA |
|---|---|
| Local government area | Swan |
| Suburb or locality | Hazelmere |
| Address | Not stated |
| Developer or applicant | GreenSquareDC |
| Status | Withdrawn |
| Planning stage | Withdrawn |
| Planning reference | DA-6/2026 |
| Assessment pathway | Development Assessment Panel (Metro Outer DAP) |
| Determination date | Not stated |
| Stated capacity | Not stated |
| Planning application lodged | Yes |
| Verification | Lead only (unverified) |
| Location precision | Suburb centroid (ABS SAL 2026, CC BY 4.0): Hazelmere |
| Last checked | 23 Nov 2026 |
Sources
- WAtoday, 14 May 2026· Retrieved23 Nov 2026
- The Guardian, 15 May 2026· Retrieved23 Nov 2026
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.