- Australian data centre tracker
- Australian Capital Territory
Australian Capital Territory data centre projects
| Project | Developer or applicant | Local government area | Status | Stated capacity | Planning application lodged | Verification | Source |
|---|---|---|---|---|---|---|---|
| CDC Beard Campus | CDC Data Centres | Not stated | Under construction | 39 MW (basis not stated) | No | Operator-disclosed only | CDC Data Centres website |
| Hume Campus 3 Data Centre Development (ESO 202600027) | CDC Data Centres (per w.media) | Not stated | Proposed (ESO rejected; EIS required) | 576 MW (basis not stated) | No | Verified (official source) | ACT ESO 202600027 rejection |
| Hume data centre, Blocks 99 and 103 Section 7 (DA 202443633) | Not stated in documents opened | Not stated | Approved | Not stated | No | Verified (official source) | ACT DA 202443633 application form |
Status key: Planned · Under construction · Withdrawn, refused or expired. Planned = proposed or approved, not yet under construction.
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams