Data centres in the Australian Capital Territory

As at 23 November 2026, we track 3 active data centre projects in the Australian Capital Territory, and none of them has a lodged planning application.

Australian Capital Territory data centre projects

Data centre projects in the Australian Capital Territory, as at 23 November 2026
ProjectDeveloper or applicantLocal government areaStatusStated capacityPlanning application lodgedVerificationSource
CDC Beard CampusCDC Data CentresNot statedUnder construction39 MW (basis not stated)NoOperator-disclosed onlyCDC Data Centres website
Hume Campus 3 Data Centre Development (ESO 202600027)CDC Data Centres (per w.media)Not statedProposed (ESO rejected; EIS required)576 MW (basis not stated)NoVerified (official source)ACT ESO 202600027 rejection
Hume data centre, Blocks 99 and 103 Section 7 (DA 202443633)Not stated in documents openedNot statedApprovedNot statedNoVerified (official source)ACT DA 202443633 application form

Status key: Planned · Under construction · Withdrawn, refused or expired. Planned = proposed or approved, not yet under construction.

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.