- Australian data centre tracker
- Western Australia
- NEXTDC P1 Stage Two data centre, Malaga (DAP/24/02641)
Project details
| State | WA |
|---|---|
| Local government area | Swan |
| Suburb or locality | Malaga |
| Address | Lot 101 (No. 10) Malaga Drive, Lot 327 (No. 10) and Lot 328 (No. 12) Millrose Drive, Malaga |
| Developer or applicant | NEXTDC (presented to the DAP; planning consultant Urbis) |
| Status | Approved |
| Planning stage | Approved |
| Planning reference | DAP/24/02641 |
| Assessment pathway | Development Assessment Panel (Metro Outer DAP) |
| Determination date | 8 May 2024 |
| Stated capacity | Not stated |
| Planning application lodged | Yes |
| Verification | Verified (official source) |
| Location precision | Approximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Malaga |
| Last checked | 23 Nov 2026 |
Sources
- MODAP/11 minutes, 8 May 2024 (City of Cockburn copy)· Retrieved23 Nov 2026
- · Retrieved
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.