Northern Territory data centre projects
| Project | Developer or applicant | Local government area | Status | Stated capacity | Planning application lodged | Verification | Source |
|---|---|---|---|---|---|---|---|
| NEXTDC D2 Darwin | NEXTDC | Not stated | Listed by operator (no development tag) | 6 MW (basis not stated) | No | Operator-disclosed only | NEXTDC website |
| Project Ares - Integrated Hyperscale Data Centre Campus | Energy North Pty Ltd | Not stated | Proposed (in planning) | 1,000 MW (IT capacity) | No | Verified (official source) | EPBC referral 2026/10560 |
Status key: Planned · Under construction · Withdrawn, refused or expired. Planned = proposed or approved, not yet under construction.
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.