CDC Maddington Campus

Under construction · Gosnells, WA · 150 MW (IT capacity)

Project details

StateWA
Local government areaGosnells
Suburb or localityMaddington
AddressLots 1, 10, 1 (No. 307, 323, 329) Kenwick Road and Lot 500 (No. 582) Bickley Road, Maddington
Developer or applicantCDC Data Centres
StatusUnder construction
Planning stageApproved
Planning referenceDAP/25/02926
Assessment pathwayDevelopment Assessment Panel (Metro Outer DAP)
Determination date10 Sep 2025
Stated capacity150 MW (IT capacity)
Planning application lodgedNo (project/campus record)
VerificationVerified (official source)
Location precisionApproximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Maddington
Last checked23 Nov 2026

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Western Australia · Australian data centre tracker