Project details
| State | WA |
|---|---|
| Local government area | Gosnells |
| Suburb or locality | Maddington |
| Address | Lots 1, 10, 1 (No. 307, 323, 329) Kenwick Road and Lot 500 (No. 582) Bickley Road, Maddington |
| Developer or applicant | CDC Data Centres |
| Status | Under construction |
| Planning stage | Approved |
| Planning reference | DAP/25/02926 |
| Assessment pathway | Development Assessment Panel (Metro Outer DAP) |
| Determination date | 10 Sep 2025 |
| Stated capacity | 150 MW (IT capacity) |
| Planning application lodged | No (project/campus record) |
| Verification | Verified (official source) |
| Location precision | Approximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Maddington |
| Last checked | 23 Nov 2026 |
Sources
- CDC Data Centres website· Retrieved23 Nov 2026
- Megawattlas project tracker, snapshot 2026-11-15 (CC BY 4.0): CDC Maddington Campus (CSV)· Retrieved23 Nov 2026
- MODAP/102 Related Information, Part B City of Gosnells (10 Sep 2025)· Retrieved23 Nov 2026
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.