- Australian data centre tracker
- Western Australia
- Meridien - Renewable Energy Hub and Data Centre
Project details
| State | WA |
|---|---|
| Local government area | Not stated |
| Suburb or locality | Not stated |
| Address | Not stated |
| Developer or applicant | Not stated in EPBC layer |
| Status | Proposed (in planning) |
| Planning stage | Not stated |
| Planning reference | Not stated |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | Not stated |
| Planning application lodged | No (project/campus record) |
| Verification | Verified (official source) |
| Location precision | EPBC referral boundary centroid |
| Last checked | 23 Nov 2026 |
Sources
- EPBC referral 2026/10654· Retrieved23 Nov 2026
- EPBC public portal (search by reference)· RetrievedNot recorded
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.