CDC Beard Campus

Under construction · ACT · 39 MW (basis not stated)

Project details

StateACT
Local government areaNot stated
Suburb or localityCanberra (Beard)
AddressNot stated
Developer or applicantCDC Data Centres
StatusUnder construction
Planning stageNot stated
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacity39 MW (basis not stated)
Planning application lodgedNo (project/campus record)
VerificationOperator-disclosed only
Location precisionApproximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Beard
Last checked23 Nov 2026

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Australian Capital Territory · Australian data centre tracker