[Australian data centre tracker]

Hume Campus 3 Data Centre Development (ESO 202600027)

Proposed (ESO rejected; EIS required) · ACT · 576 MW (basis not stated)

Project details

StateACT
Local government areaNot stated
Suburb or localityHume (Block 28 Section 23)
AddressNot stated
Developer or applicantCDC Data Centres (per w.media)
StatusProposed (ESO rejected; EIS required)
Planning stageNot stated
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacity576 MW (basis not stated)
Planning application lodgedNo (project/campus record)
VerificationVerified (official source)
Location precisionBlock centroid: Block 28 Section 23 Hume (ACTmapi block register, CC BY 4.0)
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Australian Capital Territory · Australian data centre tracker