- Hume Campus 3 Data Centre Development (ESO 202600027)
Project details
| State | ACT |
|---|---|
| Local government area | Not stated |
| Suburb or locality | Hume (Block 28 Section 23) |
| Address | Not stated |
| Developer or applicant | CDC Data Centres (per w.media) |
| Status | Proposed (ESO rejected; EIS required) |
| Planning stage | Not stated |
| Planning reference | Not stated |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | 576 MW (basis not stated) |
| Planning application lodged | No (project/campus record) |
| Verification | Verified (official source) |
| Location precision | Block centroid: Block 28 Section 23 Hume (ACTmapi block register, CC BY 4.0) |
| Last checked | 23 Nov 2026 |
Sources
- ACT ESO 202600027 rejection· Retrieved23 Nov 2026 (search summary)
- w.media: CDC rethinks 576MW Canberra data centre· Retrieved23 Nov 2026 (search summary)
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.
Back to Australian Capital Territory · Australian data centre tracker