NEXTDC D2 Darwin

Listed by operator (no development tag) · NT · 6 MW (basis not stated)

Project details

StateNT
Local government areaNot stated
Suburb or localityDarwin
AddressNot stated
Developer or applicantNEXTDC
StatusListed by operator (no development tag)
Planning stageNot stated
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacity6 MW (basis not stated)
Planning application lodgedNo (project/campus record)
VerificationOperator-disclosed only
Location precisionCity/suburb (operator)
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Northern Territory · Australian data centre tracker