Guide · Australia-wide

NCC 2025 and ESD requirements by state and territory

NCC 2025 doesn't start on the same day everywhere, and some states vary Section J. This guide shows which edition applies where, what NCC 2025 changes, and the state rules that sit on top. Checked 1 November 2026.

Request a Fee Proposal →
Adoption dates
Section J
Condensation
Solar PV
State variations

Ask about your project

Tell us the state, building class and approval stage. We'll confirm which rules apply and send a scope and fee proposal.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
We've worked with pretty great people at some awesome companies. here are some of them:
[The short answer]

Which NCC edition applies in each state and territory?

NCC 2025 was published on 1 May 2026, but each state and territory decides when it takes effect. As at 1 November 2026, the ABCB lists these adoption dates for the Building Code of Australia (NCC Volumes One and Two):

  • Victoria: NCC 2025 from 1 May 2026.
  • Australian Capital Territory: NCC 2025 from 1 May 2026, with a 12-month transition period.
  • Western Australia: NCC 2025 from 1 May 2026, with a 12-month transition period.
  • New South Wales: NCC 2025 from 1 May 2027.
  • Queensland: NCC 2025 from 1 May 2027. NCC 2022 stays in force until 30 April 2027.
  • South Australia: NCC 2025 from 1 May 2027 for the building volumes. The Plumbing Code (Volume Three) took effect on 1 May 2026.
  • Tasmania: NCC 2025 from 1 May 2027. It applied temporarily from 1 May to 4 June 2026; NCC 2022 applies again from 5 June 2026.
  • Northern Territory: NCC 2025 has not been adopted.

Source: ABCB, NCC 2025 state and territory adoption information. The edition that applies to your project also depends on the state's transition rules and on when your building approval is applied for or issued. Your building surveyor or certifier confirms it.

[What changes]

What NCC 2025 changes for ESD and Section J

Energy and emissions caps (J1P1)

The NCC 2025 J1P1 Performance Requirement adds near zero operational greenhouse gas emissions. The hourly caps for conditioned space become 40 kJ/m².hr and 4 g CO2-e/m².hr for Class 6, 22 kJ/m².hr and 2.2 g CO2-e/m².hr for Class 5, 7b, 8 and 9a (other than ward areas) and Class 9b schools, and 8 kJ/m².hr and 1 g CO2-e/m².hr for other classes. Under NCC 2022 the caps were 80, 43 and 15 kJ/m².hr, with no emissions cap.

Solar PV on the roof (J9D5)

The NCC 2025 Deemed-to-Satisfy Provisions require an on-site solar PV system. It must cover 100% of the roof area, less the excluded areas listed in J9D5(2)(a), or meet the minimum peak output per m² of conditioned space in Table J9D5a. Buildings that use gas for building services need extra PV capacity (J9D5(3)). The switchboard must also have space for a future battery system (J9D5(1)), unless batteries are installed. J9D5(2) does not apply where the whole effective roof is heavily shaded, or where on-site renewable generation of at least equivalent capacity is provided.

Condensation in external walls (F8D3)

NCC 2025 Table F8D3 sets vapour permeance ranges for the layers outside the primary insulation by climate zone and wall type. In climate zones 6, 7 and 8, a drained and ventilated cavity must be provided. The Part F8 Deemed-to-Satisfy Provisions apply to sole-occupancy units of Class 2 buildings and Class 4 parts (F8D2).

The J1V3 reference building test

For Class 3, 5, 6, 7, 8 and 9 buildings, NCC 2025 J1V3 compares the proposed building with a reference building. Its annual greenhouse gas emissions must be not more than 97% of the reference building's (J1V3(1)(a)(i)), its services must emit no more than the reference services (J1V3(1)(a)(ii)), it must meet a thermal comfort or zone-load test (J1V3(1)(b)) and it must comply with Specification 33 (J1V3(1)(c)). A J1V3 result supports a Performance Solution, which your building surveyor or certifier assesses.

Clause references are from NCC 2025 Volume One as published by the ABCB. States can vary any of these provisions, so check the state variations below.

[State variations]

Where the states add their own rules

Most states adopt Section J as published. Three have rules that change the work on a typical project:

  • New South Wales varies Section J. BASIX regulates the thermal performance of Class 2 apartments and Class 4 parts, the BASIX certificate version sets the Section J edition for Class 2 buildings, and large non-residential projects also meet the Sustainable Buildings SEPP. See our NSW Section J, BASIX and SEPP guide.
  • Queensland stays on NCC 2022 until 30 April 2027, and the Queensland Development Code continues to apply alongside the NCC. From 1 May 2027, its NCC 2025 variations remove some gas electrification-readiness requirements in Parts J6 and J8. See our Queensland NCC and Section J guide.
  • Tasmania went back to NCC 2022 on 5 June 2026. Its NCC 2025 variations keep older Section J editions for some building classes, and its condensation variation points designers to the CBOS Tasmanian Designers' Guide. See our Tasmania condensation and NCC guide.
  • Victoria adopted NCC 2025 on 1 May 2026. Many Victorian councils also ask for an ESD report at planning stage, which our ESD consulting service covers.
[How it works]

How we work in your state

Confirm the rules

We confirm the state, building class, NCC edition and any state variation that applies, and note the approval date your certifier is working to.

01

Choose the pathway

We compare the Deemed-to-Satisfy and Verification Method pathways for your design and recommend the one with the least cost and risk.

02

Model and report

We prepare the Section J, J1V3, condensation or ESD report, citing the edition and clauses that apply in your state.

03

Support the approval

We answer certifier and building surveyor queries and update the report if the design changes, within the agreed scope.

04

Timing: Timeframes confirmed at quote; fast-track available for urgent projects.

What we need from you

  • Site address and state
  • Building class, use and floor area
  • Architectural drawings or a model, at the current stage
  • The NCC edition your certifier expects, if you know it
  • Any planning conditions or rating targets

Frequently asked questions

Is NCC 2025 in force in my state?

expand

As at 1 November 2026, NCC 2025 applies in Victoria, the ACT and Western Australia (from 1 May 2026; the ACT and WA have 12-month transitions). New South Wales, Queensland and Tasmania adopt it on 1 May 2027, and South Australia adopts the building volumes on 1 May 2027. The Northern Territory has not adopted it. Source: ABCB adoption information.

Which NCC edition applies to my project?

expand

It depends on your state's adoption date and transition rules, and on when your building approval is applied for or issued. Your building surveyor or certifier confirms the edition. We check it at the start of every job and cite it in the report.

Does NCC 2025 change J1V3 modelling?

expand

Yes. For Class 3, 5, 6, 7, 8 and 9 buildings, NCC 2025 J1V3 requires annual greenhouse gas emissions not more than 97% of the reference building's, a services emissions test, a thermal comfort or zone-load test and Specification 33. The J1P1 caps also add greenhouse gas limits. NSW inserts its own J1V3, and Tasmania keeps an earlier Section J.

Does NCC 2025 require solar panels on commercial buildings?

expand

Under the NCC 2025 Deemed-to-Satisfy Provisions, J9D5 requires an on-site solar PV system covering the roof (less the excluded areas) or meeting the minimum output in Table J9D5a, with extra capacity where gas is used for building services. There are limitations for heavily shaded roofs and for buildings with equivalent on-site renewable generation. It applies once your state has adopted NCC 2025 and subject to any state variation.

Do Class 2 apartments change under NCC 2025?

expand

Section J for Class 2 buildings does not change: NCC 2025 keeps Section J of NCC 2022 Amendment 2 for them. Part F8 does change, with the new Table F8D3 for Class 2 sole-occupancy units and Class 4 parts. In NSW, BASIX regulates the thermal performance of the apartments and the BASIX certificate version sets the Section J edition. Tasmania applies Section J of BCA 2019 Amendment 1 to Class 2 buildings and Class 4 parts.

Do you work outside Victoria?

expand

Yes. We're based in Melbourne and prepare Section J, J1V3, condensation and ESD reports for projects Australia-wide. Each report uses the NCC edition and state variations that apply to the project's state.

How long does a report take?

expand

Timeframes are confirmed at quote, and fast-track is available for urgent projects.

How current is this guide?

expand

We checked the rules against ABCB and state government sources on 1 November 2026. Adoption dates can change, so we confirm the current position for every project.

[Why Makao]

Why work with Makao across states

State rules checked for every job

We confirm the edition and state variations before we model, and cite the clauses in the report.

One team, every pathway

Deemed-to-Satisfy, J1V3, condensation and ESD reports from the same team.

Qualified people

Our founder, Kelvin Mureithi: Green Star Accredited Professional, ISAP and Engineers Australia member.

Melbourne-based, Australia-wide

We are based in Melbourne and work with design teams Australia-wide.

Reviewed by Kelvin Mureithi, Founder, Makao · Green Star Accredited Professional, ISAP, Engineers Australia member. Rules checked against ABCB and state government sources on 1 November 2026.

[start with makao]
Weave sustainability into
your next project
With Makao, your building becomes a strategic asset: resilient, resource efficient, and aligned with your long-term goals for growth and sustainability.
reach out today
Kelvin Mureithi - MakaoLalaine Valencia
send us a message