Wellcamp data centre expansion, 65 Witmack Road (Toowoomba MCUC/2016/2385/E)

Approved (change application, reported) · Toowoomba Regional, QLD

Project details

StateQLD
Local government areaToowoomba Regional
Suburb or localityWellcamp
Address65 Witmack Road, Wellcamp
Developer or applicantCenturia (owner, per ASX results); applicant not confirmed
StatusApproved (change application, reported)
Planning stageApproved (change application, reported)
Planning referenceMCUC/2016/2385/E
Assessment pathwayNot stated
Determination dateNot stated
Stated capacityNot stated
Planning application lodgedNo (project/campus record)
VerificationLead only (unverified)
Location precisionProperty point: exact address match in Property Address Queensland
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Queensland · Australian data centre tracker