- Wellcamp data centre expansion, 65 Witmack Road (Toowoomba MCUC/2016/2385/E)
Project details
| State | QLD |
|---|---|
| Local government area | Toowoomba Regional |
| Suburb or locality | Wellcamp |
| Address | 65 Witmack Road, Wellcamp |
| Developer or applicant | Centuria (owner, per ASX results); applicant not confirmed |
| Status | Approved (change application, reported) |
| Planning stage | Approved (change application, reported) |
| Planning reference | MCUC/2016/2385/E |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | Not stated |
| Planning application lodged | No (project/campus record) |
| Verification | Lead only (unverified) |
| Location precision | Property point: exact address match in Property Address Queensland |
| Last checked | 23 Nov 2026 |
Sources
- PlanningAlerts: 65 Witmack Road Wellcamp· RetrievedNot recorded
- · Retrieved
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.
Back to Queensland · Australian data centre tracker