Project details
| State | QLD |
|---|---|
| Local government area | Sunshine Coast |
| Suburb or locality | Maroochydore |
| Address | 10 South Sea Islander Way, Maroochydore (Lot 10 SP305311) |
| Developer or applicant | NEXTDC Limited |
| Status | Approved; under construction (operator) |
| Planning stage | Approved |
| Planning reference | EDQ DEV2025/1604 |
| Assessment pathway | EDQ PDA development application (Maroochydore City Centre PDA) |
| Determination date | 30 Jun 2025 |
| Stated capacity | 6 MW (basis not stated) |
| Planning application lodged | No (project/campus record) |
| Verification | Verified (official source) |
| Location precision | Property point: lot match (Lot 10 SP305311) in Property Address Queensland |
| Last checked | 23 Nov 2026 |
Sources
- EDQ development assessment DEV2025/1604· Retrieved23 Nov 2026
- NEXTDC website· Retrieved23 Nov 2026
- EDQ DAD DEV-2026-SCR-5608· Retrieved23 Nov 2026
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.
Back to Queensland · Australian data centre tracker