- Australian data centre tracker
- New South Wales
- Macquarie IC3 Super West
Project details
| State | NSW |
|---|---|
| Local government area | Not stated |
| Suburb or locality | Macquarie Park |
| Address | Not stated |
| Developer or applicant | Macquarie Data Centres |
| Status | Under construction |
| Planning stage | Not stated |
| Planning reference | Not stated |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | 47 MW (basis not stated) |
| Planning application lodged | No (project/campus record) |
| Verification | Lead only (unverified) |
| Location precision | Suburb centroid (ABS SAL 2026, CC BY 4.0): Macquarie Park |
| Last checked | 23 Nov 2026 |
Sources
- Megawattlas project tracker, snapshot 2026-11-15 (CC BY 4.0): Macquarie IC3 Super West (CSV)· Retrieved23 Nov 2026
- Cited by Megawattlas: www.macquariedatacentres.com· RetrievedNot recorded
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.