[Australian data centre tracker]

Kurri Kurri Data Centre

Proposed (in planning) · Cessnock City, NSW · 550.5 MW (power consumption)

Project details

StateNSW
Local government areaCessnock City
Suburb or localitySawyers Gully
Address145 Bishops Bridge Road Sawyers Gully 2326
Developer or applicantADW Johnson Pty Limited
StatusProposed (in planning)
Planning stageUnder assessment
Planning referenceSSD-128819490
Assessment pathwayState Significant Development
Determination dateNot stated
Stated capacity550.5 MW (power consumption)
Planning application lodgedYes
VerificationVerified (official source)
Location precisionSuburb centroid (ABS SAL 2026, CC BY 4.0): Sawyers Gully
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to New South Wales · Australian data centre tracker