- Australian data centre tracker
- New South Wales
- Kurri Kurri Data Centre
Project details
| State | NSW |
|---|---|
| Local government area | Cessnock City |
| Suburb or locality | Sawyers Gully |
| Address | 145 Bishops Bridge Road Sawyers Gully 2326 |
| Developer or applicant | ADW Johnson Pty Limited |
| Status | Proposed (in planning) |
| Planning stage | Under assessment |
| Planning reference | SSD-128819490 |
| Assessment pathway | State Significant Development |
| Determination date | Not stated |
| Stated capacity | 550.5 MW (power consumption) |
| Planning application lodged | Yes |
| Verification | Verified (official source) |
| Location precision | Suburb centroid (ABS SAL 2026, CC BY 4.0): Sawyers Gully |
| Last checked | 23 Nov 2026 |
Sources
- NSW Major Projects: SSD-128819490· Retrieved23 Nov 2026
- · Retrieved
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.