- EdgeConneX / Stockland MPark Stage 2
Project details
| State | NSW |
|---|---|
| Local government area | Not stated |
| Suburb or locality | Macquarie Park |
| Address | Not stated |
| Developer or applicant | EdgeConneX |
| Status | Proposed (announced) |
| Planning stage | Not stated |
| Planning reference | Not stated |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | 100 MW (basis not stated) |
| Planning application lodged | No (project/campus record) |
| Verification | Lead only (unverified) |
| Location precision | Suburb centroid (ABS SAL 2026, CC BY 4.0): Macquarie Park |
| Last checked | 23 Nov 2026 |
Sources
- Megawattlas project tracker, snapshot 2026-11-15 (CC BY 4.0): EdgeConneX / Stockland MPark Stage 2 (CSV)· Retrieved23 Nov 2026
- Cited by Megawattlas: announcements.asx.com.au· RetrievedNot recorded
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.