[Australian data centre tracker]

DigiCo BNE3

Under construction · QLD · 19.6 MW (basis not stated)

Project details

StateQLD
Local government areaNot stated
Suburb or localityBrisbane
AddressNot stated
Developer or applicantDigiCo REIT
StatusUnder construction
Planning stageNot stated
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacity19.6 MW (basis not stated)
Planning application lodgedNo (project/campus record)
VerificationOperator-disclosed only
Location precisionCity/suburb (Megawattlas)
Last checked23 Nov 2026

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Queensland · Australian data centre tracker