- Australian data centre tracker
- New South Wales
- DCI Poplars Data Centre Project
Project details
| State | NSW |
|---|---|
| Local government area | Queanbeyan-Palerang Regional |
| Suburb or locality | Jerrabomberra |
| Address | 2 Wolseley Place, Jerrabomberra (Lot 6 Dp 1288362) |
| Developer or applicant | DCI |
| Status | Approved |
| Planning stage | Approved |
| Planning reference | SSD-64287712 |
| Assessment pathway | State Significant Development |
| Determination date | 6 Nov 2025 |
| Stated capacity | 25.4 MW (basis not stated) |
| Planning application lodged | Yes |
| Verification | Verified (official source) |
| Location precision | Property point: exact address match in NSW Geocoded Addressing Theme |
| Last checked | 23 Nov 2026 |
Sources
- NSW Major Projects: SSD-64287712· Retrieved23 Nov 2026
- · Retrieved
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.