[Australian data centre tracker]

Davis Road Data Centre (Cundall)

Approved · Fairfield City, NSW · 180 MW (power consumption)

Project details

StateNSW
Local government areaFairfield City
Suburb or localityWetherill Park
Address3 Davis Road, Wetherill Park
Developer or applicantCundall Johnston and Partners Pty Limited
StatusApproved
Planning stageApproved
Planning referenceSSD-59416728
Assessment pathwayState Significant Development
Determination date20 Dec 2024
Stated capacity180 MW (power consumption)
Planning application lodgedYes
VerificationVerified (official source)
Location precisionProperty point: exact address match in NSW Geocoded Addressing Theme
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to New South Wales · Australian data centre tracker