Project details
| State | NSW |
|---|---|
| Local government area | Penrith |
| Suburb or locality | Kemps Creek |
| Address | 845-901 Mamre Road, Kemps Creek |
| Developer or applicant | CDC Data Centres |
| Status | Proposed (in planning) |
| Planning stage | Scoping (SEARs) |
| Planning reference | SSD-133677993 |
| Assessment pathway | State Significant Development |
| Determination date | Not stated |
| Stated capacity | 1,400 MW (power consumption) |
| Planning application lodged | No (SEARs/scoping only) |
| Verification | Verified (official source) |
| Location precision | Suburb centroid (ABS SAL 2026, CC BY 4.0): Kemps Creek |
| Last checked | 23 Nov 2026 |
Sources
- NSW Major Projects: SSD-133677993· Retrieved23 Nov 2026
- · Retrieved
- CDC Data Centres (operator/press)· Retrieved23 Nov 2026
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.