CDC Data Centre Campus, Kemps Creek

Proposed (in planning) · Penrith, NSW · 1,400 MW (power consumption)

Project details

StateNSW
Local government areaPenrith
Suburb or localityKemps Creek
Address845-901 Mamre Road, Kemps Creek
Developer or applicantCDC Data Centres
StatusProposed (in planning)
Planning stageScoping (SEARs)
Planning referenceSSD-133677993
Assessment pathwayState Significant Development
Determination dateNot stated
Stated capacity1,400 MW (power consumption)
Planning application lodgedNo (SEARs/scoping only)
VerificationVerified (official source)
Location precisionSuburb centroid (ABS SAL 2026, CC BY 4.0): Kemps Creek
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to New South Wales · Australian data centre tracker