51 Huntingwood Drive Data Centre

Approved · Blacktown, NSW · 400 MW (power consumption)

Project details

StateNSW
Local government areaBlacktown
Suburb or localityHuntingwood
Address51 Huntingwood Drive, Huntingwood Nsw 2148
Developer or applicantEMKC CUBED MANAGEMENT PTY LTD
StatusApproved
Planning stageApproved
Planning referenceSSD-41589232
Assessment pathwayState Significant Development
Determination date15 Sep 2023
Stated capacity400 MW (power consumption)
Planning application lodgedYes
VerificationVerified (official source)
Location precisionProperty point: exact address match in NSW Geocoded Addressing Theme
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to New South Wales · Australian data centre tracker