Proposed (in planning) · City of Ryde, NSW · 70 MW (power consumption)

Project details

StateNSW
Local government areaCity of Ryde
Suburb or localityMacquarie Park
Address23-25 Waterloo Road, Macquarie Park
Developer or applicantGreenbox Architecture Pty Ltd
StatusProposed (in planning)
Planning stageEIS in preparation
Planning referenceSSD-91297457
Assessment pathwayState Significant Development
Determination dateNot stated
Stated capacity70 MW (power consumption)
Planning application lodgedNo (SEARs/scoping only)
VerificationVerified (official source)
Location precisionProperty point: exact address match in NSW Geocoded Addressing Theme
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to New South Wales · Australian data centre tracker