The code asks for solar on the roof. Shading decides how much.

NCC 2025 asks for solar PV on the roof area that isn't excluded, or a minimum output per square metre of conditioned space. Shading, plant and terraces decide which roof counts, and the surveyor will ask how you measured it. We model the shading, map the eligible area and coordinate with your Section J.

NCC 2025 J9D5
Shading model
Eligible roof area
Section J coordination

Get started

Send us your roof plan and site context.

We'll reply within one business day

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
We've worked with pretty great people at some awesome companies. here are some of them:
Ratio Consultants logoHansen Partnership logoOFFICE logo

[Why it matters]

The roof you have left decides what J9D5 asks for.

NCC 2025 moved J9D5 from "leave room for solar" to "install solar". For Class 3 and 5–9 buildings, PV must cover the roof area except areas shaded for more than 25% of annual daylight hours, plus other listed exclusions. The alternative is to meet a minimum peak output per m² of conditioned space. Shading therefore sets your compliance obligation. We model the roof, map the shaded area against the 25% test, and document the PV area and exclusions for your Section J report.

Underestimate it

And you install panels that won't perform.

Overestimate it

And the building surveyor asks for evidence you don't have.

[What does NCC 2025 J9D5 require?]

Rooftop solar PV and shading assessment against NCC 2025 J9D5.

PV covering 100% of the roof area, excluding areas that are shaded for more than 25% of annual daylight hours; pitched over 45°; awnings, car parks, roof gardens or occupied terraces; roof lights and translucent roofing; trafficable, height safety and maintenance access paths, or paths of travel to an exit; plant and services areas; above exhaust air flows; or impractical for panel size or mounting.

Or a minimum peak PV output per m² of conditioned space (Table J9D5a). For climate zones 2–7 this is 65 W/m² for Class 5, 6 and 7, and 40 W/m² for Class 3 and 9. Buildings using gas need additional PV capacity (Table J9D5b); those panels must not be shaded for more than 25% of daylight hours or pitched over 45°. The requirement doesn't apply where 100% of the effective roof area is shaded for more than 70% of annual daylight hours, or where equivalent on-site renewable generation is provided.

Switchboard: at least 2 empty three-phase breaker slots and 4 labelled DIN rail spaces for a future battery. This doesn't apply if a battery is installed.

NCC 2022 J9D5

Still current where NCC 2025 isn't yet adopted. Same switchboard provisions. At least 20% of the roof area must be kept clear for future PV. The exemptions include where the whole roof is shaded for more than 70% of daylight hours.

Neighbouring solar (Victoria, residential)

Since Amendment VC267 (in operation 31 March 2025), Clause 55.05-2 (Overshadowing domestic solar energy systems), Standard B5-2, sets setbacks for new buildings next to an existing solar system on an adjoining lot. It applies where the existing solar system is on a building in a Township, General Residential or Neighbourhood Residential Zone.

[What you receive]

What's included in a rooftop solar PV and shading assessment

3D roof and context model

Your building, plant, parapets, lift overruns and neighbouring buildings.

Annual shading analysis

Of the roof in daylight-hour terms, mapped against the 25% and 70% thresholds.

Eligible PV area schedule

Each J9D5(2) exclusion marked up on the roof plan.

PV sizing

The area-based layout compared with the Table J9D5a W/m² alternative.

Gas buildings

The additional Table J9D5b capacity, with its panel siting checked.

Report for the building surveyor

Included in or appended to the Section J report.

Optional

An overshadowing check against neighbouring rooftop solar for Victorian Clause 55 proposals.

What we need from you

Roof plan, elevations, services layout and site context.

[When do you need it?]

When NCC 2025 applies, and the situations we see.

Any Class 3 or 5–9 building using the NCC 2025 J9D5 Deemed-to-Satisfy provisions. NCC 2025 applies in Victoria from 1 May 2026, and in WA and the ACT from 1 May 2026 with a 12-month transition. Projects claiming a J9D5 shading exemption under NCC 2022 or 2025, and Victorian townhouse proposals next to existing rooftop solar, need it too. NSW has a state variation to J9D1. Check variations for your project.

Victoria

NCC 2025 adoption: 1 May 2026, no transition period.

Western Australia and the ACT

NCC 2025 adoption: 1 May 2026, 12-month transition.

NSW and Queensland

NCC 2025 adoption: 1 May 2027.

Tasmania

NCC 2025 adoption: 1 May 2027 (temporarily adopted 1 May–4 June 2026).

“The building surveyor asked how we got our eligible roof area.”

We give you a shading map and an exclusion schedule they can check.

“Plant, lift overruns and the tower next door shade half the roof.”

We quantify which areas are over 25% and test the W/m² alternative.

“Our Section J was scoped under NCC 2022, but the building permit application is after 1 May 2026.”

We confirm which edition applies and what J9D5 now requires.

[How it works]

What happens after you send us your project.

Send us your design

Roof plan, elevations, services layout and site context.

01

We confirm the NCC edition and quote

Fast-track timeframes are available case by case; timeframes are confirmed at quote.

02

We model and lay out

Shading model, eligible area, PV layout and the alternative pathway check.

03

You get the report

A J9D5 compliance report for the building surveyor, coordinated with the Section J assessment.

04

Frequently asked questions

Does NCC 2025 require solar on every roof?

expand

For Class 3 and 5–9 buildings using the Deemed-to-Satisfy route, yes, subject to the exclusions and the W/m² alternative. It doesn't apply where the whole effective roof is shaded for more than 70% of daylight hours, or where equivalent on-site renewables are provided.

Which edition applies to my project?

expand

It depends on the state and the application date. NCC 2025 took effect in VIC, WA and the ACT on 1 May 2026 (WA and the ACT with a 12-month transition), and takes effect in NSW, QLD and TAS on 1 May 2027.

What counts as "shaded for more than 25%"?

expand

The test is the proportion of annual daylight hours an area is shaded. That's why we model the full year, not a single winter-solstice snapshot.

Do roof terraces and plant areas count?

expand

No. Occupied terraces, roof gardens, plant areas, maintenance access and several other areas are excluded.

Does J9 protect my neighbour's solar panels?

expand

No. J9D5 is about your own building. In Victoria, existing domestic rooftop solar on adjoining lots is addressed through the Clause 55 planning standards.

Is a battery required?

expand

Not under J9D5. The switchboard must have spaces reserved for one, unless a battery is installed.

[Why Makao]

Same team, same model

Roof decisions tested once

The model behind your Section J and daylight work covers PV, so roof decisions are tested once.

Reviewed by Kelvin Mureithi, Founder, Makao · Green Star Accredited Professional, ISAP, Engineers Australia member.

[start with makao]
Weave sustainability into
your next project
By the time a report is due, most of the decisions it tests are already drawn and priced. Bring us in while they can still change, and the report confirms the design instead of reshaping it.
Request a fee proposal
Kelvin Mureithi - MakaoLalaine Valencia
send us a message