Project details
| State | TAS |
|---|---|
| Local government area | Burnie |
| Suburb or locality | Burnie |
| Address | Not stated |
| Developer or applicant | VIRIDIS Green Data Centres Limited |
| Status | Approved (reported by developer) |
| Planning stage | Approved |
| Planning reference | Not stated |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | Not stated |
| Planning application lodged | No (project/campus record) |
| Verification | Operator-disclosed only |
| Location precision | Approximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Burnie |
| Last checked | 23 Nov 2026 |
Sources
- VIRIDIS: Tasmanian data centre development given planning approval· RetrievedNot recorded
- · Retrieved
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.
Back to Tasmania · Australian data centre tracker