- Australian data centre tracker
- South Australia
- Quantum DC Tungkillo Compute and Energy Hub
Project details
| State | SA |
|---|---|
| Local government area | Mid Murray |
| Suburb or locality | Tungkillo |
| Address | Not stated |
| Developer or applicant | Quantum DC Pty Ltd |
| Status | Paused (pre-lodgement) |
| Planning stage | Paused (no application lodged) |
| Planning reference | Not stated |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | Not stated |
| Planning application lodged | No (project/campus record) |
| Verification | Operator-disclosed only |
| Location precision | Approximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Tungkillo |
| Last checked | 23 Nov 2026 |
Sources
- Quantum DC media release, 12 Nov 2026· RetrievedNot recorded
- ABC News, 12 Nov 2026· RetrievedNot recorded
- · Retrieved
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.