NEXTDC GE1 Geelong

In development (operator term) · VIC · 4.4 MW (basis not stated)

Project details

StateVIC
Local government areaNot stated
Suburb or localityGeelong
AddressNot stated
Developer or applicantNEXTDC
StatusIn development (operator term)
Planning stageNot stated
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacity4.4 MW (basis not stated)
Planning application lodgedNo (project/campus record)
VerificationOperator-disclosed only
Location precisionSuburb centroid (ABS SAL 2026, CC BY 4.0): Geelong
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Victoria · Australian data centre tracker