[Australian data centre tracker]

NEXTDC Craigieburn land

Proposed (land acquired, press) · Hume, VIC

Project details

StateVIC
Local government areaHume
Suburb or localityCraigieburn
AddressNot stated
Developer or applicantNEXTDC
StatusProposed (land acquired, press)
Planning stageProposed (land acquired, press)
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacityNot stated
Planning application lodgedNo (project/campus record)
VerificationLead only (unverified)
Location precisionSuburb centroid (ABS SAL 2026, CC BY 4.0): Craigieburn
Last checked23 Nov 2026

Sources

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Victoria · Australian data centre tracker