Firmus AI Factory Stirling North (Project Southgate)

Proposed (pre-lodgement) · SA · 1,300 MW (IT capacity)

Project details

StateSA
Local government areaNot stated
Suburb or localityStirling North
AddressNot stated
Developer or applicantFirmus Technologies
StatusProposed (pre-lodgement)
Planning stagePre-lodgement (seeking Crown sponsorship under the PDI Act 2016)
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacity1,300 MW (IT capacity)
Planning application lodgedNo (project/campus record)
VerificationOperator-disclosed only
Location precisionApproximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Stirling North
Last checked23 Nov 2026

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to South Australia · Australian data centre tracker