- Australian data centre tracker
- South Australia
- Firmus AI Factory Stirling North (Project Southgate)
Project details
| State | SA |
|---|---|
| Local government area | Not stated |
| Suburb or locality | Stirling North |
| Address | Not stated |
| Developer or applicant | Firmus Technologies |
| Status | Proposed (pre-lodgement) |
| Planning stage | Pre-lodgement (seeking Crown sponsorship under the PDI Act 2016) |
| Planning reference | Not stated |
| Assessment pathway | Not stated |
| Determination date | Not stated |
| Stated capacity | 1,300 MW (IT capacity) |
| Planning application lodged | No (project/campus record) |
| Verification | Operator-disclosed only |
| Location precision | Approximate: suburb/locality centroid (ABS SAL 2026, CC BY 4.0): Stirling North |
| Last checked | 23 Nov 2026 |
Sources
- Megawattlas project tracker, snapshot 2026-11-15 (CC BY 4.0): Firmus AI Factory Stirling North (Project Southgate) (CSV)· Retrieved23 Nov 2026
- Cited by Megawattlas: firmus.co· RetrievedNot recorded
- Firmus South Australia Community Hub· Retrieved23 Nov 2026
Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.
Power before floor area: a grid-capacity decision guide for project teams
How this record was compiled, and the source licences and attribution: Methodology, sources and licences.