Data centre, 210 Swann Drive, Derrimut

Approved (permit issued; construction status not checked) · Permit 005.2019.00000082.001 · Brimbank, VIC

Project details

StateVIC
Local government areaBrimbank
Suburb or localityDerrimut
Address210 Swann Drive, Derrimut
Developer or applicantNot stated
StatusApproved (permit issued; construction status not checked)
Planning stageApproved
Planning reference005.2019.00000082.001
Assessment pathwayCouncil planning permit
Determination date30 Aug 2019
Stated capacityNot stated
Planning application lodgedYes
VerificationVerified (official source)
Location precisionSuburb only: no exact match in Vicmap Address, so not mapped
Last checked23 Nov 2026

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.

Power before floor area: a grid-capacity decision guide for project teams

How this record was compiled, and the source licences and attribution: Methodology, sources and licences.

Back to Victoria · Australian data centre tracker