Bundey Data Centre Campus

Proposed (in planning) · SA · 800 MW (basis not stated)

Project details

StateSA
Local government areaNot stated
Suburb or localityBundey
AddressNot stated
Developer or applicantIREN
StatusProposed (in planning)
Planning stageNot stated
Planning referenceNot stated
Assessment pathwayNot stated
Determination dateNot stated
Stated capacity800 MW (basis not stated)
Planning application lodgedNo (project/campus record)
VerificationVerified (official source)
Location precisionEPBC referral boundary centroid
Last checked23 Nov 2026

Capacity is shown only as the source states it, with its basis (for example power consumption, IT capacity or MVA). Figures with different bases are not added together.