Planning tool · Clause 55.05 Sustainability

Check the sustainability standards before you lodge

Standards B5‑1 to B5‑7 sit in Clause 55.05 of the Victoria Planning Provisions. Work through one standard at a time. Each step is labelled as a calculated check, a design input from the drawings or a model, or a judgement call for an assessor.

[Source] Clause 55.05, Standards B5‑1 to B5‑7. VPP current to VC322, checked 18 November 2026.
[Covers] Permeability and stormwater, rooftop solar, north-window shading, waste, plant noise and apartment cooling load.

About the proposal

These two questions decide which standards apply. Everything else lives in the standard it belongs to. Clause 55 applies to the classes of applications listed in the relevant zone (including clauses 32.04‑7, 32.05‑8, 32.07‑6, 32.08‑7, 32.09‑7 and 32.10‑5). Check the current scheme.

What is being proposed?

Townhouses and other non-apartment dwellings. Standard B5‑3 applies. Standard B5‑7 does not.

Standard B5‑3 does not apply. Standard B5‑7 does. “Apartment development” is not a defined term in Clause 73.01 — use the meaning you would put to council.

Standards B5‑3 and B5‑7 do not apply (Clause 55 Application).

The checker will flag B5‑3, B5‑5 and B5‑7 as needing a judgement on applicability.

B5-1 Permeability and stormwater NOT STARTED

To reduce the impact of increased stormwater run-off, facilitate on-site infiltration, encourage retention and reuse, and contribute to urban cooling.

Clause 55.05‑1, Standard B5‑1, last amended by VC315 (24 September 2026). Figures below are from the standard as fetched from the VPP API on 18 November 2026.

Calculated

Pervious area of the site

The site area covered by the pervious surfaces is at least 20 percent of the site.

m²
m²

“Pervious surfaces” is not defined in Clause 73.01. Enter the area you would show on the plans.

Design input

Stormwater quality

The stormwater management system is designed to meet the best practice targets stated in Standard B5‑1, which attributes them to Urban stormwater management guidance (EPA Publication 1739.1, 2021): suspended solids 80%, total phosphorus and total nitrogen 45%, and litter 70% reduction in mean annual load.

A note to the standard says a certificate showing a minimum 100 per cent Blue Factor score, or documentation from MUSIC or an equivalent product accepted by the responsible authority showing those objectives are met, can be used. This checker does not run a stormwater model. EPA Publication 1739.1 itself has not been opened for this checker; the percentages are as they appear in the standard.

What evidence will you use?

Judgement call

Stormwater flow path

The standard also requires the system to direct flows of stormwater into treatment areas, garden areas, tree pits and permeable surfaces, with drainage of residual flows to the legal point of discharge.

Whether flows are “directed into” those areas is a layout judgement. Record your reading of the drawings here; an assessor still needs to review it.

On the drawings, are flows directed in that way?

B5-2 Overshadowing existing solar NOT STARTED

To ensure that the height and setback of a building from a boundary allows reasonable solar access to existing domestic solar energy systems on the roofs of buildings.

Clause 55.05‑2, Standard B5‑2, last amended by VC267. “Domestic solar energy system” means one that existed at the date the application was lodged.

Design input

Existing adjoining solar

Is there an existing domestic solar energy system on the roof of a building on an adjoining lot, that existed at lodgement?

The standard says it “applies to an existing building in a Township Zone, General Residential Zone or Neighbourhood Residential Zone.” It does not clearly say whether that is the subject site or the adjoining lot. This checker treats the adjoining existing building as the relevant one, and flags the ambiguity.

Design input

22 September shadow test

The setback envelope applies to any part of a new building that will reduce the sunlight to that system at any time between 9 am and 4 pm on 22 September.

Do shadow diagrams show a reduction of sunlight in that window?

Judgement call

Setback envelope

Where the new building would reduce that sunlight, it must be set back from the boundary to that lot by at least 1 metre at 3.6 metres above ground level, plus 0.3 metres for every metre of building height over 3.6 metres up to 6.9 metres, plus 1 metre for every metre of height over 6.9 metres.

The checker can calculate the minimum setback from the height you enter. Whether the building sits inside that envelope, and which parts of it reduce sunlight, is an assessor’s review of the drawings and shadow diagrams.

m
m

B5-3 Rooftop solar area NOT STARTED

To support the future installation of appropriately sited rooftop solar energy systems for a dwelling.

Clause 55.05‑3, Standard B5‑3 and Table B5‑3, last amended by VC267. This standard does not apply to apartments and residential buildings (Clause 55 Application and Standard B5‑3).

Calculated

Minimum roof area for each dwelling

Each dwelling needs a rooftop solar energy area with a minimum dimension of 1.7 metres and a minimum area of 15 m² (1 bedroom), 26 m² (2 or 3 bedrooms) or 34 m² (4 or more bedrooms). The area can be contiguous or multiple smaller areas.

Design input

Orientation, position and obstructions

The area is oriented to the north, west or east, is positioned on the top two thirds of a pitched roof, and is free of rooftop obstructions within twice the height of each obstruction (H), measured horizontally (D) from the centre point of the base of the obstruction to the nearest point of the area. Obstructions south of all points of the area are not subject to that distance requirement.

Diagram B5‑3 from Clause 55.05‑3: an obstruction of height H on a roof, and the rooftop solar energy area, with horizontal distance D measured from the centre point of the base of the obstruction to the nearest point of the solar area.
Diagram B5‑3, Clause 55.05‑3 (VPP ordinance image, fetched 17 November 2026 and unchanged on 18 November 2026).

The standard does not define north, west or east by degrees, and it does not say what happens on a flat roof. Those are judgement calls if they arise.

B5-4 Shading north-facing windows NOT STARTED

To encourage external shading of north facing windows to minimise summer heat gain.

Clause 55.05‑4, Standard B5‑4, last amended by VC267.

Calculated

Shade depth against window height

North facing windows are shaded by eaves, fixed horizontal shading devices or fixed awnings with a minimum horizontal depth of 0.25 times the window height.

Are there north-facing windows in the proposal?

Standard B5‑4 does not define the north-facing sector. The sector definition in Standard B4-2 (Clause 55.04-2) is “for this standard” only, so it is not used here automatically.

B5-5 Waste and recycling NOT STARTED

To ensure dwellings are designed to facilitate waste recycling, and that facilities are accessible, of sufficient size, and designed to minimise impacts on residential amenity.

Clause 55.05‑5, Standard B5‑5 and Tables B5‑5.1 and B5‑5.2, last amended by VC267.

Calculated

Bin store size

The development includes a bin storage area of at least the area, depth and height in Table B5‑5.1 (dwellings other than in an apartment development) or Table B5‑5.2 (dwellings in an apartment development).

Type of bin storage (non-apartment dwellings)

Table B5‑5.1: at least 1.8 m², 0.8 m depth, 1.8 m high.

3 dwellings or fewer: 5.4 m². 4 or more: 1 m² per dwelling plus 4 m². Depth 0.8 m, height 1.8 m in both cases.

m²
m
m

Calculated

Internal waste space

Each dwelling includes an internal waste and recycling storage space of at least 0.07 cubic metres with a minimum depth of 250 millimetres.

m³
mm

Judgement call

Access, path of travel and collection

For a shared non-apartment store: the store is within 40 metres of a kerbside collection point, includes a tap for bin washing, and there is a continuous path of travel free of steps and obstructions from dwellings to the store. Where private bin collection is provided on the land, access ways must allow the vehicle to enter and exit in a forward direction. For an apartment development: a continuous path of travel is provided from each dwelling to bin storage areas.

m
Tap for bin washing (shared non-apartment store)
Continuous path of travel, free of steps and obstructions, from dwellings to the store?
If private collection is provided on the land, can the vehicle enter and exit in a forward direction?

“Continuous path of travel” is not further defined in the standard. Treat “Needs a closer look” as a judgement for the assessor.

B5-6 Mechanical plant NOT STARTED

To minimise the impact of mechanical plant noise located in the development.

Clause 55.05‑6, Standard B5‑6, last amended by VC267. This standard is mostly a judgement call.

Judgement call

Plant location and screening

Mechanical plant, including mechanical car storage and lift facilities, is not located immediately adjacent to bedrooms of new or existing dwellings or small second dwellings, unless a solid barrier is in place to provide a line of sight barrier to transmission of noise and the location of all relevant bedrooms.

“Immediately adjacent” and “line of sight barrier to transmission of noise” are not defined in the standard. Record the layout here; an assessor needs to review the drawings, and may need a closer acoustic look.

Is mechanical plant immediately adjacent to any bedroom of a new or existing dwelling or small second dwelling?

B5-7 Energy efficiency (apartments) NOT STARTED

To achieve energy efficient dwellings and buildings, and to ensure dwellings achieve adequate thermal efficiency.

Clause 55.05‑7, Standard B5‑7 and Table B5‑7, last amended by VC267. The objective does not apply to a dwelling that is not in an apartment development, or to a residential building (Clause 55 Application).

Design input

Climate zone in Table B5‑7

Dwellings in or forming part of an apartment development located in a climate zone identified in Table B5‑7 must not exceed the maximum annual cooling load in that table. For example, Climate zone 21 Melbourne is 30 MJ/m² per year.

This checker compares the annual cooling load you enter with the limit in Table B5‑7. It does not produce or promote an energy rating, and it will not guess the climate zone. If you are not sure which zone in the table applies, leave it as “Not sure”.

Calculated

Annual cooling load for each dwelling

Enter the annual cooling load already calculated for each dwelling, in MJ/m² per year. The checker compares that figure with the Table B5‑7 limit for the selected zone. The decision guidelines also refer to the annual cooling load for each dwelling, so the cap is applied per dwelling.

Nothing entered yet.
[Labels used in this checker]

Calculated, design input, or judgement call

[Calculated]

20% / setback envelope / Table B5‑3

Pervious surfaces are to cover at least 20 percent of the site. The B5‑2 setback is 1 metre at 3.6 metres, then 0.3 metres per metre up to 6.9 metres, then 1 metre per metre above that. Rooftop solar area in Table B5‑3 is 15, 26 or 34 m² with a 1.7 m minimum dimension. North-window shade depth is 0.25 times the window height.

[Design input]

Drawings, diagrams and models

Shadow diagrams for 22 September between 9 am and 4 pm, the roof plan, shade devices, the waste path, and an energy-rating model already prepared for the application are design inputs. This checker does not generate those.

[Judgement call]

Needs an assessor

Whether plant is immediately adjacent, whether a barrier is a line of sight barrier to transmission of noise, and how “apartment development” is read, are judgement calls. The checker will not guess a climate zone in Table B5‑7.

[Defaults]

B5‑2 and B5‑6

If the calculated B5‑2 setback is met, the standard records as Meets*. If plant is not immediately adjacent to bedrooms, B5‑6 records as Meets*. A footnote explains that added justification may be needed in the planning submission.

Every item in the checker is labelled Calculated, Design input or Judgement call.

Indicative only. This is not advice and not a statement that a proposal complies. The responsible authority decides whether a standard and the corresponding objective are met, and a modified standard in a zone, a schedule or an overlay may apply. Results do not account for every overlay or schedule, how council classifies the development, or later amendments. Check the current planning scheme and confirm with council or a qualified consultant.

Clause 55.05 as fetched from the Victoria Planning Provisions API on 18 November 2026. VPP current to VC322 (2 November 2026). Standard B5‑1 last amended by VC315 (24 September 2026); Standards B5‑2 to B5‑7 last amended by VC267.

[start with makao]
Weave sustainability into
your next project
By the time a report is due, most of the decisions it tests are already drawn and priced. Bring us in while they can still change, and the report confirms the design instead of reshaping it.
Request a fee proposal
Kelvin Mureithi - MakaoLalaine Valencia