Waste Management Plans

The bin room fit the plan. The waste truck didn't fit the laneway.

A Waste Management Plan (WMP) sets out how a development stores, separates and collects its waste. We prepare operational and construction WMPs for councils Australia-wide, with deep knowledge of Victorian requirements, and we resolve bin rooms and vehicle access while the drawings can still change.

Operational WMP
Construction & Demolition WMP
Melbourne-based · Australia-wide
Residential, Commercial, Mixed Use, Public

Get started

Send us your plans and project address. We'll confirm the council requirements, scope and fee before you commit.

We'll reply within one business day

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
We've worked with pretty great people at some awesome companies. here are some of them:
Ratio Consultants logoHansen Partnership logoOFFICE logo

[What is a Waste Management Plan?]

The document that resolves your bins, and your permit condition, before construction.

A Waste Management Plan (WMP) is a planning document that shows how a development will store, separate and collect waste and recycling over its life. It covers bin numbers and sizes, bin-room layout, collection vehicle access, collection frequency and how residents or tenants move waste to the bin room.

In Victoria, apartment developments must meet the waste and recycling standard in Clause 58.06-3 of the planning scheme, which refers to Sustainability Victoria's guide for waste management in multi-unit developments. Councils also commonly ask for a WMP for commercial, mixed-use and larger residential projects, often as a planning permit condition. The City of Melbourne publishes its own WMP guidelines.

Getting the WMP right early avoids a common trap: a plan the council waste officer rejects, followed by conditions, delays and revised drawings. Under Victoria's new recycling laws, households are moving to four separate waste streams: rubbish, mixed recycling, glass (by 2027) and food and garden organics (by 2030). So bin rooms need space for more streams than older plans allowed.

Operational WMP

Usually required at planning permit stage for apartment, commercial and mixed-use developments. Covers bin storage, separate streams, collection vehicle access and how waste moves from each dwelling or tenancy to the bin room.

Construction & Demolition WMP

Covers the construction phase, often as a planning or building permit condition. Documents how site waste will be separated and diverted from landfill, and is common on Green Star and council-required projects.

[When do you need a waste management plan?]

Sound familiar? You probably need a WMP.

You usually need a Waste Management Plan when council lists one as a planning permit condition. Some councils also ask for a Construction and Demolition WMP. Because WMPs are often the last item added to a scope, they can hold up a permit if left late. These are the situations we see most often on Melbourne and Victorian projects.

"Council just issued conditions and there’s a WMP on the list. We’re lodging next week."

Planning permit condition — the most common trigger. Send us the permit conditions and drawings, and we'll confirm the council requirements and a delivery date before you commit.

"Our architect didn’t realise a WMP was needed. We’re already in documentation."

Missed from the original scope — common, and fixable. We work from the planning or permit drawings, with no BIM files or separate briefing needed. If the bin room or truck access doesn't work, we tell you while the drawings can still change.

"The previous WMP got knocked back by council’s waste team. We’re not sure why."

Rejected WMP — council waste officers have specific expectations, and they vary between councils. We review the refusal or RFI, identify what the waste team needs, and revise the plan and drawings markup to address it.

"We’re doing mixed-use with residential above retail. Do we need one plan or two?"

Mixed use — we structure the WMP to address residential and commercial waste separately, with separate bin rooms or clear allocation where needed, so council assessors can follow the logic.

"The builder is asking for a Construction WMP before submitting the building permit."

Construction stage — a Construction and Demolition WMP can be set as a permit condition, separate from the operational WMP lodged at planning. We prepare them standalone or alongside the operational WMP.

"Our project is targeting Green Star certification. Does the WMP need to cover more than a standard council submission?"

Green Star projects — Green Star Buildings asks for more than a standard council submission, including dedicated storage for separated waste streams and construction waste diversion. We align the WMP with the Green Star credits and your council's requirements.

“Does our council have its own waste requirements? We're in Melbourne.”

Yes. Requirements vary from council to council. The City of Melbourne publishes its own WMP guidelines, and many Victorian councils refer to Sustainability Victoria's multi-unit guide. We prepare each WMP to the relevant council's requirements as standard.

"We're still in pre-DA. Is it too early to be thinking about the WMP?"

Early is better. WMPs have spatial implications: bin storage, vehicle access and turning paths need to be resolved in the drawings. Getting this right before lodgement avoids redesign later.

When does a Victorian council require a WMP?

The state planning rules set the baseline and each council adds its own triggers. This table summarises what the planning scheme and a selection of councils publish. Your permit conditions always take precedence.

WhereWhen a WMP is required or expectedSource
Victoria Planning Provisions, Clause 58.06-3Apartment developments covered by Clause 58: waste and recycling facilities should be designed and managed in line with a WMP approved by the responsible authority (Standard D24).Clause 58.06
Victoria Planning Provisions, Clauses 55.05-5 and 57.05-2Two or more dwellings, and residential buildings up to six storeys: if the waste storage standard (B5-5 or E5-2) is not met, council must consider the design response, including a WMP.Clause 55.05, Clause 57.05
City of MelbourneA WMP may be required with a planning permit application. Once endorsed it becomes part of the permit. Templates suit small developments; large developments need a detailed plan.Council WMP page
City of WhitehorseDevelopments of 3 or more dwellings, any development with a basement, and any commercial development. More than 5 dwellings or commercial: a comprehensive WMP at application.Council WMP page
City of DarebinFewer than 10 units: council's template. 10 or more units, mixed use and non-residential: a professionally prepared WMP.Waste Management Guidelines 2021
City of Moonee ValleyMost developments of 4 or more dwellings need an approved WMP, often as a planning permit condition.Council development waste page
City of Ballarat3 or more dwellings, all commercial developments, and sites where council's kerbside or communal collection cannot be provided.WMP guidelines for multi-unit developments
City of Glen EiraResidential development applications may need specialist reports, including on waste management.Residential development page

Checked against each source on 5 November 2026. Council requirements change, so check your permit conditions and council's current guidelines. Read the full council-by-council guide.

What we need from you

Your architectural drawings (PDF or DWG), the project address, and any permit conditions or council request for further information that mention waste. We take dwelling numbers, tenancy areas and site layout from the drawings and confirm anything else with you.

[How it works]

From drawings to a council-ready Waste Management Plan.

Send your plans

Email your architectural drawings (PDF is fine) and project address. We check the council's waste requirements and confirm scope.

01

We quote and confirm

You receive a fee proposal with a confirmed delivery date before any work starts.

02

We prepare the WMP

We prepare the WMP to your council's requirements. Bin room, streams and vehicle access issues are flagged before they become permit conditions.

03

You submit

You receive a council-ready PDF for lodgement. If council comes back with questions, we respond and revise.

04

Frequently asked questions

What is a Waste Management Plan?

expand

A Waste Management Plan (WMP) is a document, usually required by council with a planning permit application or as a permit condition, that sets out how a development will store, separate and collect waste and recycling. It covers bin numbers, bin-room layout, collection vehicle access and collection frequency.

What's the difference between an operational WMP and a Construction & Demolition WMP?

expand

An operational WMP covers waste once the building is occupied: bins, storage, collection access and recycling. A Construction & Demolition (C&D) WMP covers the build itself: how site waste is separated, reused or recycled and diverted from landfill. Some projects need both.

Does my project need a Waste Management Plan in Victoria?

expand

Apartment developments in Victoria must meet the waste and recycling standard in Clause 58.06-3 of the planning scheme, and councils commonly ask for a WMP for apartment, commercial and mixed-use projects. Check your permit conditions or council pre-application advice, or send us the address and plans and we'll confirm.

Can I use the council's WMP template instead?

expand

Some councils, including the City of Melbourne, publish WMP guidelines or templates. A template tells you what to cover. It doesn't size the bin room, check truck access or resolve the drawings. We follow the council's format and do the design work behind it.

What information do you need to prepare a WMP?

expand

In most cases, your architectural drawings (PDF or DWG) and the project address. We take dwelling numbers, tenancy areas and site layout from the drawings and confirm anything else with you.

Can the WMP be included in our ESD report?

expand

It depends on the council. Some accept the WMP as part of a Sustainable Management Plan or ESD report; others require a standalone document. When Makao prepares both, we keep them consistent and format them for that council.

Do you respond to council comments on the WMP?

expand

Yes. If the council's waste team raises questions or an RFI after lodgement, we respond and revise the plan so it can be endorsed.

How long does a Waste Management Plan take?

expand

Timeframes are confirmed at quote, and fast-track is available for urgent projects. If council has set a deadline for further information, tell us upfront.

Further reading: Waste Management Plans: A Developer's Guide and 10 Common Waste Streams in Australia

[Why Makao]

Waste Management Plans written for the council that will assess them.

Council-specific

Each WMP follows the relevant council's guidelines, such as the City of Melbourne's WMP guidelines, not a generic template.

Design resolved early

We size bin rooms and check collection access while the drawings can still change, not after a permit condition.

Ready for four streams

Bin rooms planned for rubbish, mixed recycling, glass and FOGO, in line with Victoria's four-stream rollout.

One team for ESD and waste

WMPs coordinated with your Sustainable Management Plan, ESD report and Green Star credits.

Revisions handled

If council comes back with comments, we revise and respond.

Melbourne-based, Australia-wide

Local knowledge of Victorian councils and their waste teams.

Reviewed by Kelvin Mureithi, Founder, Makao · Green Star Accredited Professional, ISAP, Engineers Australia member.

[Related services]
Waste Strategy
Whole-of-life waste strategy for Green Star and larger developments, from construction to operation.
→
ESD Consulting
Sustainable Management Plans and ESD reports for Victorian planning permits, coordinated with your WMP.
→
Water Design
Water and stormwater design for Victorian planning permits, coordinated with your ESD and waste documents.
→
[start with makao]
Weave sustainability into
your next project
By the time a report is due, most of the decisions it tests are already drawn and priced. Bring us in while they can still change, and the report confirms the design instead of reshaping it.
Request a fee proposal
Kelvin Mureithi - MakaoLalaine Valencia
send us a message