Net-positive water frameworks

Net-positive water frameworks

“Net-positive water” is not a single Australian statutory term, and it is not a promise that a project will generate more clean water than it consumes. We help you define a water-balance framework and then test how close the design can get.

Water-balance framework
Sources and boundary
Options study
Residuals recorded

Get started

Send us your drawings and what the brief means by net-positive water. We'll confirm the scope and the fee.

We'll reply within one business day

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
We've worked with pretty great people at some awesome companies. here are some of them:
Ratio Consultants logoHansen Partnership logoOFFICE logo

This page is part of Water Design.

Send the drawings, location, building use, and what the brief means by net-positive water — including any named framework.

If the brief is specifically the Living Building Challenge Water Petal, use Living Building Challenge Water Petal advisory. That is a certification pathway. This page is the wider design method.

What the framework has to state

Before the phrase appears in a report, the method needs to name:

Water sources

Rainfall, stormwater, recycled greywater or blackwater, municipal top-up, groundwater or another named source.

System and spatial boundary

Building, site, precinct or catchment, and which meters count.

Time period

Typically a stated typical year or climate sequence.

Quality and end uses

Drinking, irrigation, cooling, toilet flushing and any other use, each matched to a fit-for-purpose quality.

Balance method

How inflows, reuse, losses, storage and discharges are counted.

What “positive” means in that method

For example remaining demand after reuse, or residual discharge compared with a stated baseline.

It does not mean the building manufactures water, or that it exports surplus drinking water. A municipal top-up can still form part of a defined method where the climate and the chosen framework allow it. We will not write “zero mains water in all climates” as a universal rule.

What you receive

  • A written definition of the framework for this project.
  • Demand reduction first, so a positive label is not used to excuse avoidable consumption.
  • Supply options matched to the named catchment and climate sequence.
  • A water-balance and options study that records residual mains, recycled and discharged volumes.
  • A statement of what the current design can support, what would need to change, and what has not been approved.

A modelled balance is not a certificate and not a health clearance.

Design decisions that change the result

A large tank without a defined method does not make the project net-positive. Storage only matters once sources, connected end uses and destination are named.

Climate, catchment area, water-intensive uses, soil, downstream infrastructure and regulation can all close off options. That is worth knowing in concept design, while roof area, plant-room space and irrigation area can still change.

Closed-loop describes how water is reused inside a defined boundary. Drinking-water quality, if it is proposed at all, remains a separate health, treatment and approval question for the specialist consultant team.

[Sound familiar]

Sound familiar?

The brief just says “net-positive water”.

The phrase needs a method before it goes in a report: sources, boundary, period, quality and end uses, balance method, and what “positive” means.

We've got a large tank, so we're net-positive.

Not without a defined method. Storage only matters once sources, connected end uses and destination are named.

Can we drop mains water completely?

Not as a universal rule. A municipal top-up can still form part of a defined method where the climate and the chosen framework allow it.

How it works

Send the ambition

Send the ambition and the site.

01

We set the framework

We set sources, boundary, period, quality and end uses for this project.

02

We record what's possible

We test what is possible and record the residuals. Timeframes are confirmed at quote.

03

Frequently asked questions

Is “net-positive water” an Australian statutory term?

expand

No. It is not a single Australian statutory term, and it is not a promise that a project will generate more clean water than it consumes.

What does the framework have to state?

expand

Water sources, the system and spatial boundary, the time period, quality and end uses, the balance method, and what “positive” means in that method.

Does a net-positive building make water?

expand

No. It does not mean the building manufactures water, or that it exports surplus drinking water.

Is a modelled balance a certificate?

expand

No. A modelled balance is not a certificate and not a health clearance.

Is this the Living Building Challenge Water Petal?

expand

No. The Water Petal is a certification pathway with its own page. This page is the wider design method.

Does closed-loop mean we can drink the water?

expand

Closed-loop describes how water is reused inside a defined boundary. Drinking-water quality, if it is proposed at all, is a separate health, treatment and approval question for the specialist consultant team.

Get in touch

Send us your drawings, the project address, and what the brief means by net-positive water.

[start with makao]
Weave sustainability into
your next project
By the time a report is due, most of the decisions it tests are already drawn and priced. Bring us in while they can still change, and the report confirms the design instead of reshaping it.
Request a fee proposal
Kelvin Mureithi - MakaoLalaine Valencia
send us a message