Green Star water credits

Green Star Water Use and Waterway Protection credits

These are two different credits. Water Use is about potable and reclaimed water demand. Waterway Protection is about stormwater quality and receiving waters. We prepare the modelling and documentation for both, while fixtures, tanks and treatment can still change.

Water Use
Waterway Protection
v1 and v1.1 registrations
Modelling and documentation

Get started

Send us your drawings and the Green Star tool and version you are registered under. We'll confirm the scope and the fee.

We'll reply within one business day

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
We've worked with pretty great people at some awesome companies. here are some of them:
Ratio Consultants logoHansen Partnership logoOFFICE logo

This page is part of Water Design.

If Green Star is in the brief, send the drawings, project address, registered tool and version, building type, and which water credits you are targeting. We work to the version your project is registered under. New Green Star Buildings registrations are under v1.1; projects already registered under v1 can continue under that version. The registered version sets the criteria, not this website.

What you receive

  • A read of the Water Use and Waterway Protection pathway that applies to your registration.
  • Water Use inputs: fixtures, irrigation, cooling-tower and process water, and any alternative or reclaimed supply you intend to claim, set against the scheme calculator.
  • Waterway Protection input: a stormwater quality narrative coordinated with the treatment measures on the drawings.
  • Design options tested early, so roof catchment, reuse end uses, treatment-train space and landscape irrigation are checked before those packages freeze.
  • Written method, inputs, assumptions and limits your Green Star lead can include.

GBCA certifies Green Star projects. We document and model the water credits.

In Green Star Buildings v1.1, Water Use can earn stepped points for performance between benchmarks. We do not reprint credit numbers, point values or reduction percentages here; those sit in GBCA's Submission Guidelines for your registered version.

Design decisions that change the result

Fixture and irrigation packages that stay generic force the Water Use claim to be guessed. Quantifying demand now is cheaper than changing sanitaryware or planting after documentation starts.

A rainwater tank can support both credits if the same roof connection, demand and treatment claims appear in both sets of evidence. It does not automatically satisfy Waterway Protection, and neither does a MUSIC model. Both can support the evidence; GBCA still decides the credit.

Raingardens that look generous on a landscape plan can still fall short if catchment, sizing or bypass is wrong. That check belongs before the landscape package is locked.

If the team wants to use a v1.1 credit on a v1 registration, that is a question for GBCA, not something we assume.

[Sound familiar]

Sound familiar?

The fixture schedule still says “generic”.

Generic fixture and irrigation packages force the Water Use claim to be guessed. Quantifying demand now is cheaper than changing sanitaryware or planting after documentation starts.

We assumed the tank covers Waterway Protection.

Not automatically, and neither does a MUSIC model. A tank can support both credits if the same roof connection, demand and treatment claims appear in both sets of evidence. GBCA still decides the credit.

The raingardens look generous on the landscape plan.

They can still fall short if catchment, sizing or bypass is wrong. We check that before the landscape package is locked.

How it works

Send the target

Send the rating target and drawings.

01

We map the credits

We map demand, supply and treatment to the two credits.

02

You get the inputs

We prepare calculator inputs and outputs once the official Water Use calculator is used, plus the Waterway Protection narrative. Timeframes are confirmed at quote.

03

Frequently asked questions

Are Water Use and Waterway Protection the same credit?

expand

No. They are two different credits. Water Use covers potable and reclaimed water demand. Waterway Protection covers stormwater quality and receiving waters.

Which Green Star version do you work to?

expand

The version your project is registered under. New registrations are under v1.1. Projects already registered under v1 can continue under that version.

Does a rainwater tank or a MUSIC model meet Waterway Protection?

expand

Not automatically. Both can support the evidence, but GBCA still decides the credit. A tank can support both credits if the same roof connection, demand and treatment claims appear in both sets of evidence.

Can we use a v1.1 credit on a v1 registration?

expand

That is a question for GBCA. We do not assume it.

Why don't you list point values?

expand

Credit numbers, point values and reduction percentages sit in GBCA's Submission Guidelines for your registered version, so we do not reprint them here.

Get in touch

Send us your drawings, the project address, and the Green Star tool and version you are registered under.

[start with makao]
Weave sustainability into
your next project
By the time a report is due, most of the decisions it tests are already drawn and priced. Bring us in while they can still change, and the report confirms the design instead of reshaping it.
Request a fee proposal
Kelvin Mureithi - MakaoLalaine Valencia
send us a message